evidoria

← Back to browse

Good practice Imported

New North Zealand Hospital: A resilient acute care hospital for the future, Hillerød, Denmark

Denmark · See the Denmark profile

Evidence: Descriptive / self-reported · Ask Evidence Copilot about this practice

730 EUR million
Construction cost of the New North Zealand Hospital
118000 m²
Hospital floor area
570 rooms
Number of single patient rooms
310000 citizens
Population served by the new hospital
5.4 EUR billion
National 10-year hospital renewal investment programme (2015-2025) (2015-2025)

Details

Maturity
Scaling
Region (NUTS)
DK013
Keywords
groundwater modelling, hospital, extreme precipitation, health care facilities

Context

Resilience of health care facilities is crucial since they provide the essential services and care, all the more needed during and in the aftermath of the extreme weather events. Effects of climate change can also directly impact the functioning of health care facilities. For instance, flooding can cause significant damage to hospital mechanical equipment while contaminating available water sources or cut off emergency access routes. Therefore, according to the WHO , health care facilities need to take effective measures to reduce the impacts of increasing extreme weather events and other climate-related hazards such as heatwaves, floods and flash-floods, strong winds and storms. Increased heavy precipitation is one of the climate challenges that Denmark is facing. Climate projections for the Hillerød municipality for the period 2040-2070 indicate increase in average rainfall of 6 to 9% (under the RCP 4.5 and RCP 8.5 scenarios, respectively) compared to the reference period 1981-2010, increasing current risks. The New North Zealand Hospital site is at risk of flooding during heavy rain events due to its low altitude and high groundwater levels. In Denmark, new buildings must be able to withstand future climate challenges and building regulations apply. In order to prevent urban flood, land use planning imposes significant restrictions on the discharge of rainwater into adjacent land, which enforces on-site management of the rainwater.

Objectives

The development and planning of the New Hospital in North Zealand are based on the political objectives stated in the political basis for construction work in the Capital Region of Denmark. Furthermore, the vision of this hospital is articulated around five objectives: (i) to offer the best treatment, (ii) to be effective and professional, (iii) to be safe, (iv) to be welcoming, (v) to be able to work across conventional boundaries. Within this last guiding principle, the hospital intends to be adapted to a changing environment. The project is part of the radical modernisation of health care systems undertaken in the Capital Region of Denmark. As the New Hospital North Zealand, Hospitals of the region will merge and expand resulting in top high-tech-hospitals with a contemporary efficient and welcoming environment for patients and better working conditions for staff in the future. The building codes of the hospital considers climate risk of flooding while the hospital is designed to allow for flexible functional planning in the case of a reorganisation of units (e.g., conversion of standard bedroom to outpatient clinic), or an increased need for patient beds (e.g., conversion of office space to patient’s rooms) that could enable it to cope with unexpected climatic events.

Activities

The New Hospital in North Zealand, Hillerød has been planned to be the central hospital resource for more than 310,000 citizens in the northern part of the Capital Region of Denmark. The hospital merges three existing hospitals: Hillerød Hospital, Elsinore Hospital and Frederikssund Hospital. It will extend over 118,000m² and include over 570 single patient rooms. The two bottom floors of the complex comprise diagnosis and treatment facilities and the two top floors houses the inpatient wards surrounding a roof garden. Taking into account climate risks related to extreme rain events, the design has necessitated: Detailed site investigation to ascertain the existing groundwater and soil conditions. Assessment of individual borehole groundwater rise relationship for varying rainfall intensity (single rainfall events and cumulated rainfall events). The precipitation over the period of 10 years (2007 to 2016) was processed to evaluate the anomalies (positive or negative deviation) from average rain events. The planning of the New Hospital in North Zealand Hospital followed the national guidelines from 2014 for adapting engineering design to different levels of precipitation. The combination of different downscaling methods of climate projections for Denmark, model runs (1950-2100 time-scale) and scenarios (A1B, RCP4.5 and RCP8.5) provided a range of possible climate factors to be compared. In particular, the precipitation event over 24 and 48 hours with 100 years return period was considered for the estimation of the correspondent groundwater levels. Based on this model, the hospital building was placed at an optimum site level and the following solutions have also been developed to reduce the risk of flooding: External ponds and streams were established to provide water storage and to move the standing water away from the access road and main hospital. Carpark trenches provide further on-site rainwater attenuation. Additional vegetated areas around the complex can serve as further rainwater storage. Setting a blueprint for future hospitals, the design primarily focusses on patient wellbeing to aid quicker recovery, with a structure that maximises closeness to nature and view of nature that plays an important part in human health and wellbeing. Finally, the hospital aims to be the most digitally-enabled project in Denmark with automated systems to maximise hospital efficiency, so healthcare workers have more time to spend with patients. The new hospital is also highly sustainable with its low energy design.

Results

Denmark is investing more than 40 billion Danish Kroner (approximately 5.4 billion euros) over a 10-year period (2015-2025) in the renewal of hospital facilities all over the country. The investment covers 16 projects. New North Zealand Hospital is one out of 4 new hospitals. The total construction of this new facility costs of approximately DKK 5.4 billion (approximately 730 million euros).

Conclusions

User involvement has been one of the key success factors as more than 300 stakeholders have taken part in the vision and design of the hospital. In addition, communication with the local authority has been extensive to ensure good collaboration.

Implementation

Implementation detail (cost, timeline, staffing, conditions for success) is not yet available for this practice.

Commonly funded by

National / regional programmes

Indicative funding routes for practices of this type — always check each programme's current calls and eligibility rules.

Do you run this practice? Claim it — verified implementers get a public contact pathway and can propose corrections.

Data sources

Where this practice's information was retrieved from, and when.

Similar practices you may find useful