North Pacific Regional Connectivity Investment Project — Palau's Submarine Fibre-Optic Cable

Palau · Koror · See the Palau profile · See the Koror profile

Evidence: Observational / pre–post Top 23% 92/100 · Ask Evidence Copilot about this practice

A $25M ADB-financed submarine fibre-optic cable, commissioned in 2017, replaced Palau's costly satellite links, multiplying capacity more than tenfold and enabling nationwide 4G, e-government and telehealth for this small Pacific nation.

25 million USD
ADB loan financing for the cable project
~25 %
Population with internet access, before the cable
90 %
Population with mobile phones, before the cable
5 × 100 Gbps
Wavelengths delivered at commissioning (November 2017)
up to 72 Mbps
Reported 4G download speeds after the cable
more than ten-fold
ADB's stated capacity increase
North Pacific Regional Connectivity Investment Project — Palau's Submarine Fibre-Optic Cable

Details

Maturity
Established
Promoter
Government of Palau, Belau Submarine Cable Corporation, with Asian Development Bank financing
Period
2015–2017 (first cable); second cable targeted 2024–2025
Keywords
submarine fibre-optic cable, mobile broadband, remote-island connectivity, e-government, telehealth

Context

Before 2017, Palau (population roughly 18,000-20,000) relied entirely on expensive, low-bandwidth satellite links for internet; only about 25% of the population had internet access despite 90% owning mobile phones.

Activities

In 2015 the Asian Development Bank approved two loans totalling $25 million for the North Pacific Regional Connectivity Investment Project, financing a low-latency submarine fibre-optic cable — built by NEC and operated by the newly formed Belau Submarine Cable Corporation — connecting Palau to the SEA-US submarine cable system via a branching unit.

Results

The cable was commissioned in November 2017, delivering five 100-gigabit-per-second wavelengths, and is credited with enabling nationwide 4G mobile broadband with reported download speeds of up to 72 Mbps. The ADB's own framing describes a "more than ten-fold" capacity increase, a more conservative figure than a widely cited "1,000-fold" quote from a company CEO in independent press.

Conclusions

A second cable, delivered under the US-Australia-Japan Trilateral Partnership for Infrastructure Investment in the Indo-Pacific and targeted for "ready for service" in 2024-2025, was commissioned specifically to add redundancy — an explicit response to the risk of depending on a single cable. Because Palau's population is very small, the absolute number of people affected is modest even though the percentage-based improvements are dramatic.

Implementation

Implementation detail (cost, timeline, staffing, conditions for success) is not yet available for this practice.

Commonly funded by

National / regional programmes

Indicative funding routes for practices of this type — always check each programme's current calls and eligibility rules.

Do you run this practice? Claim it — verified implementers get a public contact pathway and can propose corrections.

Data sources

Where this practice's information was retrieved from, and when.

Attachments

Similar practices you may find useful