Denver Water — From Forests to Faucets Watershed Protection Partnership (USA)
United States of America
After 1996 and 2002 wildfires choked Denver's reservoirs with sediment, Denver Water and the US Forest Service treated 120,000+ acres …
Kyrgyzstan · Chon-Aksuu, Issyk-Kul Region · See the Kyrgyzstan profile
Evidence: Descriptive / self-reported Top 69% 40/100 · Ask Evidence Copilot about this practice
CAREC used a Swiss Re grant to run Central Asia's first Payment for Ecosystem Services pilot in Kyrgyzstan's Chon-Aksuu watershed (2011–2014): ~400 mushroom pickers planted 50,000 seedlings on 4 ha as in-kind payment for forest access; later scaled into a four-basin programme.
The Chon-Aksuu watershed drains into Lake Issyk-Kul in Kyrgyzstan and supports upstream forestry, pasture and wild-mushroom harvesting alongside downstream irrigated horticulture, all competing for the same river. Overgrazing and forest degradation upstream were increasing sediment loads and reducing water quality for irrigators below.
With a Swiss Re Foundation ReSource Award (2011) grant running August 2011 to August 2013, the Regional Environmental Centre for Central Asia (CAREC) designed and facilitated the region's first Payment for Ecosystem Services scheme. A Coordination Committee of buyers, sellers and local authorities was formed, and a roughly 400-member mushroom pickers' association plus a water users' association became the core participants. Because cash was scarce locally, members opted for labour-in-kind: association members planted 50,000 tree seedlings on 4 hectares to restore degraded forest in exchange for continued, organised access to picking grounds, while a linked afforestation/REDD-style component supplemented incomes.
CAREC and its funders report the pilot reached completion and was the first working PES scheme in Central Asia; by 2012–2017 the approach was scaled into a four-basin programme with additional partners (Norway, UNEP, the OSCE Programme Office in Astana, the EU, USAID and the World Bank-financed CAMP4ASB programme), and water-measuring equipment was installed in the Chon-Aksuu basin specifically to improve irrigation efficiency.
No independent, quantified monitoring of sediment loads or water quality before and after the pilot has been published, and the in-kind payment values were not formally costed — a limitation for anyone weighing replication against a cash-based PES design.
Philanthropic / foundation funding LIFE Programme
Indicative funding routes for practices of this type — always check each programme's current calls and eligibility rules.
Do you run this practice? Claim it — verified implementers get a public contact pathway and can propose corrections.
Where this practice's information was retrieved from, and when.
United States of America
After 1996 and 2002 wildfires choked Denver's reservoirs with sediment, Denver Water and the US Forest Service treated 120,000+ acres …
Rwanda
Rwanda's national PES mechanism since 2005: 10% of revenues from 4 national parks (~234,000 ha) redistributed to communities. US $1.55 …
Spain
Since 2003, Andalusia's government has paid shepherds a fixed bonus plus €42–90/ha to graze firebreaks; coverage grew eight-fold from 700 …
Albania
After a decade-long campaign, Albania designated 12,727ha along 270km of the Vjosa and its tributaries as Europe's first Wild River …
Open full copilot Grounded in cited practices — always check the sources.