JSIF's World Bank-financed programme bundles roads, water, legal power connections and schools with social and crime-prevention work in Jamaica's most excluded inner-city communities; ICDP reached 89,000 residents in 18 communities, rated Satisfactory.

ICBSP & ICDP — Jamaica's Integrated Inner-City Upgrading and Violence-Prevention Programme (JSIF / World Bank)

Details

Promoter
Jamaica Social Investment Fund (JSIF)
Period
mid-2000s–present (ICDP 2014–2021; ICDP II to 2026)
Keywords
neighbourhood upgrading, inner-city, basic services, community safety, violence prevention, World Bank

Description

The Jamaica Social Investment Fund (JSIF) has run two successive World Bank-financed programmes that combine small-scale urban infrastructure with community-based social and violence-prevention interventions in inner-city areas and informal settlements. The first, the Inner-City Basic Services for the Poor Project (ICBSP, IBRD loan of US$29.3 million), worked in 12 communities and benefited over 60,000 people; its completion reported substantial infrastructure gains and higher perceived safety, but weak institutional strengthening.
The follow-on Integrated Community Development Project (ICDP, US$42 million IBRD loan, approved March 2014, closed May 2021) targeted 18 other communities with an estimated 89,000 residents. According to the World Bank completion report it rehabilitated 47.4 km of roads and 17 schools, raised legal household electricity connections from 9,131 to 12,335 people (target 10,300), gave about 13,000 residents improved water, and helped residents obtain over 6,000 civil-registration documents. Perceived safety reached 75.58% at endline (about 85% after a re-analysis), and the outcome was rated Satisfactory.
The evidence has clear limits: the safety baseline used a faulty methodology and was discarded, the final evaluation firm applied the wrong scale, sanitation reached only 58% of target, two communities lost infrastructure packages, and connections face payment risks. Crime effects rest on perception surveys and anecdotes, not audited crime data. Still, the model was replicated and institutionalised: the Government of Jamaica now funds an ICDP II with its own resources, with works in St. James scheduled to end in March 2026.

Read the full analysis: https://jis.gov.jm/?p=386335

Implementation

Implementation detail (cost, timeline, staffing, conditions for success) is not yet available for this practice.

Do you run this practice? Claim it — verified implementers get a public contact pathway and can propose corrections.