A 100-hectare GEF/UNDP wetland near Port Said treats ~25,000 m³/day of polluted drain water before it reaches Lake Manzala and the Mediterranean, improving local water quality — even as the lagoon's own fish yield has collapsed under pollution the wetland alone can't offset.

~100 hectares
Wetland area
~25,000 m3/day
Drainage water treated
US$4.5 million
GEF grant
US$11.1 million
Total project cost
~11%
Lake Manzala fish yield vs 1980s peak (by 2020)
Lake Manzala Engineered Wetland: Treating Drainage Water Before Egypt's Largest Lagoon

Details

Maturity
Established
Promoter
Egyptian Ministry of Water Resources and Irrigation / GEF-UNDP
Period
2001-2010
Keywords
wastewater treatment, coastal wetlands, aquaculture

Context

Built from 2001 with a US$4.5 million GEF grant alongside UNDP and Egyptian government co-financing (total project cost about US$11.1 million), the Lake Manzala Engineered Wetland is a roughly 100-hectare constructed wetland southwest of Port Said. It intercepts part of the polluted Bahr El Baqar drain, passing it through vegetated treatment cells to trap sediment and reduce pollutant loads before the water reaches Lake Manzala, Egypt's largest coastal lagoon.

Results

Project documentation and follow-up hydrodynamic and water-quality studies report measurable improvements in water and sediment quality attributable to the wetland, treating roughly 25,000 m3/day; treated effluent is used to rear juvenile fish for restocking the lake and supplying other aquaculture.

Conclusions

Lake Manzala's own commercial fish yield, once over half of Egypt's total catch in the 1980s, had fallen to around 11% of historical levels by 2020 because of basin-wide eutrophication, heavy-metal pollution and habitat loss that a single 100-hectare facility cannot reverse -- illustrating both the value and the limits of treating just one drain among many feeding a heavily stressed water body.

Implementation

Indicative cost
High (€500k–€5M)
Time to results
Long (> 3 years)
Staffing & skills
Global Environment Facility (GEF), UNDP, Egyptian government

Conditions for success

  • vegetated treatment cells designed to trap sediment and reduce pollutant loads
  • treated effluent reused for aquaculture restocking, demonstrating a low-cost alternative to conventional treatment

Common failure modes

  • treats only one drain among many feeding a heavily stressed lagoon; cannot reverse basin-wide eutrophication and pollution driving the lake's fish-yield collapse

Commonly funded by

National / regional programmes LIFE Programme

Indicative funding routes for practices of this type — always check each programme's current calls and eligibility rules.

Do you run this practice? Claim it — verified implementers get a public contact pathway and can propose corrections.

Data sources

Where this practice's information was retrieved from, and when.

Attachments

Similar practices you may find useful