Lake Manzala Engineered Wetland: Treating Drainage Water Before Egypt's Largest Lagoon

Egypt · Port Said · See the Egypt profile

Top 81% 33/100 · Ask Evidence Copilot about this practice

A 100-hectare GEF/UNDP wetland near Port Said treats ~25,000 m³/day of polluted drain water before it reaches Lake Manzala and the Mediterranean, improving local water quality — even as the lagoon's own fish yield has collapsed under pollution the wetland alone can't offset.

Lake Manzala Engineered Wetland: Treating Drainage Water Before Egypt's Largest Lagoon

Details

Promoter
Egyptian Ministry of Water Resources and Irrigation / GEF-UNDP
Period
2001-2010
Keywords
wastewater treatment, coastal wetlands, aquaculture

Description

Built from 2001 with a US$4.5 million GEF grant alongside UNDP and Egyptian government co-financing (total project cost about US$11.1 million), the Lake Manzala Engineered Wetland is a roughly 100-hectare constructed wetland southwest of Port Said, Egypt. It intercepts a portion of the heavily polluted Bahr El Baqar drain — which carries municipal, industrial and agricultural wastewater — and passes it through vegetated treatment cells designed to trap sediment and reduce pollutant loads before the water reaches Lake Manzala, Egypt's largest coastal lagoon, and ultimately the Mediterranean Sea.
Project documentation and follow-up hydrodynamic and water-quality studies report measurable improvements in water and sediment quality attributable to the wetland, and the treated effluent is used to rear juvenile fish for restocking the lake and supplying other aquaculture operations, demonstrating a low-cost alternative to conventional treatment plants for the region.
The honest caveat is scale: Lake Manzala's own commercial fish yield, once over half of Egypt's total catch in the 1980s, is estimated to have fallen to around 11% of historical levels by 2020 because of basin-wide eutrophication, heavy-metal pollution and habitat loss that a single 100-hectare facility cannot reverse. The case illustrates both the value and the limits of a wetland-treatment approach when it treats only one drain among many feeding a heavily stressed water body.

Read the full analysis: https://iwlearn.net/iw-projects/395

Implementation

Implementation detail (cost, timeline, staffing, conditions for success) is not yet available for this practice.

Do you run this practice? Claim it — verified implementers get a public contact pathway and can propose corrections.

Data sources

Where this practice's information was retrieved from, and when.

Attachments

Similar practices you may find useful