A €22.7m federal Biodiversity Programme project that re-watered old Luppe channels in Leipzig's floodplain forest: a 5 km brook can flood again, ~20 ha inundated after water returned, and amphibians have trended upward since 2013.
The Leipzig floodplain forest (Auwald) lost its natural flooding after the Luppe and Weiße Elster were straightened, diked and diverted into the canal-like 'Neue Luppe', leaving former river courses dry and favouring maple over typical alluvial oak, ash and elm.
From 2012 the cities of Leipzig and Schkeuditz, NABU Sachsen, the Helmholtz Centre for Environmental Research (UFZ) and Leipzig University ran 'Lebendige Luppe', funded with about €22.7 million by the Federal Agency for Nature Conservation under the Federal Biological Diversity Programme and by the Saxon State Foundation for Nature and the Environment. Measures revived the 5 km Burgauenbach so it can overflow its banks, converted the Zschampert ditch back into a near-natural stream, refilled dried-out ponds and modernised the Elster basin water intake, repaired in 2023 to supply about 500 litres per second.
Reported results: about 20 ha were flooded one week after water was restored to the Burgauenbach; monitoring since 2013 shows positive amphibian trends, with the fire-bellied toad as key species, and the great crested newt has reappeared. A related long-running flood experiment (7 ha flooded each spring since 1993) has sharply reduced maple while planted oaks thrive.
Caveats: published outcome data are largely project-reported summaries; peer-reviewed vegetation and biodiversity trend data for the Luppe itself are not yet available, and a wider 4,750 ha floodplain land-use concept remains a plan.
Read the full analysis: https://www.lebendige-luppe.de/
Implementation detail (cost, timeline, staffing, conditions for success) is not yet available for this practice.
Do you run this practice? Claim it — verified implementers get a public contact pathway and can propose corrections.
Where this practice's information was retrieved from, and when.
Lithuania
A 1990s dam on the Salantas was removed for €310,520 of EU structural funds. River-lamprey nests above the site rose …
France
France removed the 36 m Vezins dam (2019-2020) and the 16 m La Roche-Qui-Boit dam (2022-2023) on the Sélune. INRAE …
Estonia
The EU LIFE-funded 'LIFE to alvars' project (2014-2019) restored 2,501.5 hectares of Estonia's globally rare alvar limestone grasslands, engaging about …
Slovakia
Slovakia's 2023-2027 CAP Strategic Plan pays farmers via the Agri-Environment-Climate Measure (AEKO) and a companion eco-scheme for grassland, organic and …
Open full copilot Grounded in cited practices — always check the sources.