Evidence: Descriptive / self-reported · Ask Evidence Copilot about this practice

None

2500 vs 1200 EUR/m2
Construction cost per square metre versus a standard building (construction period)
55 %
Share of apartments sold within two days of launch (at launch)
90 %
Share of apartments sold during construction (during construction)
5500 (about 500 above area average) EUR/m2
Average sale price versus area average (sales period)

Details

Maturity
Established
Region (NUTS)
ITC11
Keywords
green roofs, sustainable materials, Bioclimatic architecture, heatwave, thermal insulation, heat island effect

Context

Torino has experienced rising maximum temperatures (about +2C over 60 years, per ARPA Piemonte) and increasing heatwaves (4 in summer 2017 alone); under RCP4.5, summer discomfort days are projected to double by 2011-2040 and triple by 2041-2070 versus 1971-2000, with tropical days rising from 2 (1971-2000) to a projected 21 by 2041-2070.

Objectives

Increase building resilience to heatwaves and temperature extremes through thermal insulation, while reducing energy demand for heating and cooling, exploiting adaptation-mitigation synergies.

Activities

The 63-apartment '25 Verde' building integrates over 150 trees and plants into a cor-ten steel façade structure, uses deciduous species for seasonal shading, high-thermal-mass construction (35cm floor slabs, thick brick walls, continuous exterior insulation), a green roof (60-100cm soil layer), and geothermal heat pumps connected to groundwater wells for heating/cooling with individual-unit metering.

Results

Construction cost was about EUR 2,500/m2, roughly double the approximately EUR 1,200/m2 standard-building average; the greenery alone accounted for 10-15% of total cost (versus 3-5% typically). Apartments sold quickly: 55% within two days of launch and 90% during construction, at an average sale price of about EUR 5,500/m2, some EUR 500/m2 above the area average at the time.

Conclusions

The building has no direct CO2 emissions (geothermal heat pumps provide heating and cooling) and is reported to contribute less to the local urban heat-island effect than surrounding buildings. Residents reported valuing the added comfort, natural light, sun protection and noise insulation. The developer received tax discounts during licensing and experienced no construction delays.

Implementation

Implementation detail (cost, timeline, staffing, conditions for success) is not yet available for this practice.

Do you run this practice? Claim it — verified implementers get a public contact pathway and can propose corrections.

Data sources

Where this practice's information was retrieved from, and when.

Similar practices you may find useful