25000 EUR
Cost of preparing the Municipal Water Management Plan (2014-2016)
4 million EUR
Estimated cost of structural protection measures for 1-in-100-year flood protection (2017-2022 plan period)
40 %
Modelled reduction in flood extent if unbuilt areas were fully reforested (theoretical scenario, MWMP elaboration)
400 million EUR
Total damage from the 2010 river flood (wider area) (2010)
1 million m3
Capacity of the water retention area under construction on the Orolo River (as of case study)

Details

Maturity
Pilot
Region (NUTS)
ITH3
Keywords
prepardness, mainstreaming, protection, prevention, Green infrastructure, water retention, water drainage

Context

Isola Vicentina (Veneto, Italy) faces both rare but damaging main-river floods (Orolo and Timonchio rivers, last major event 2010) and frequent, cumulatively damaging pluvial flooding from its local drainage network. Regional climate models point to less frequent but more intense precipitation, increasing future flood risk.

Objectives

The municipality's Municipal Water Management Plan (MWMP), developed after signing the EU Mayors Adapt initiative in 2014, aims to go beyond standard drainage coordination and become a local flood-adaptation plan combining prevention, protection and preparedness, designed against return periods up to 1-in-300 years.

Activities

The plan combined official hydrogeological maps, historical-event data from local authorities, and citizen consultation to identify over 20 critical drainage areas, then defined about 50 protection measures (retention areas, ditch works, drainage upgrades), plus prevention measures (woodland preservation, a 10-hectare pilot reforestation area) and preparedness measures (citizen flood booklets, four public workshops).

Results

The MWMP itself cost EUR 25,000 to prepare; structural protection measures were estimated at roughly EUR 2 million (1-in-50-year protection) to EUR 4 million (1-in-100-year protection). A one-million-cubic-metre water retention area on the Orolo River was under construction with regional funding at the time of writing.

Conclusions

Success relied on strong mayoral commitment, IUAV University scientific support, and citizen input. Implementation was constrained by the plan being run by a single municipality without formal coordination with upstream/downstream neighbours, and by unresolved questions over which stakeholder (farmers, homeowners, water companies) is responsible for which part of the drainage system.

Implementation

Implementation detail (cost, timeline, staffing, conditions for success) is not yet available for this practice.

Commonly funded by

National / regional programmes

Indicative funding routes for practices of this type — always check each programme's current calls and eligibility rules.

Do you run this practice? Claim it — verified implementers get a public contact pathway and can propose corrections.

Data sources

Where this practice's information was retrieved from, and when.

Similar practices you may find useful