Rugezi Marsh Peatland Restoration — Rwanda

Rwanda · Butaro · See the Rwanda profile

Evidence: Observational / pre–post Top 47% 47/100 · Ask Evidence Copilot about this practice

Rwanda restored the degraded Rugezi Marsh - source of two hydropower-feeding lakes - after 48.5% of its 6,735ha peatland was destroyed by 2000; grey-crowned crane numbers rose from 80 to 273 by 2023, and costly diesel backup power was no longer needed.

6,735 hectares
Marsh area
48.5%
Marsh surface destroyed by 2000 (by 2000)
over Rwf65 million/month
Diesel backup power cost avoided
28,000
Fodder cuttings distributed to herders
80 → 273
Grey-crowned crane population (2008-2023)
2006
Ramsar listing year
Rugezi Marsh Peatland Restoration — Rwanda

Details

Maturity
Established
Promoter
Rwanda Environment Management Authority (REMA) / Rwanda Wildlife Conservation Association (RWCA)
Period
2008-present
Keywords
high-altitude peatland restoration, hydropower watershed protection, wetland rehabilitation, Ramsar site

Context

Rugezi Marsh is a high-altitude (about 2,050-2,100m) tropical peatland covering 6,735 hectares in Rwanda's Northern Province, regulating water inflow to Lake Burera and Lake Ruhondo, which in turn feed the Ntaruka and Mukungwa hydropower plants — historically among Rwanda's most important electricity sources. By around 2000, an estimated 48.5% of the marsh's surface had been destroyed by agricultural drainage and cattle grazing; the resulting drop in lake levels and hydropower output forced the country to spend over Rwf65 million a month on diesel-fuelled backup generation.

Activities

In response, Rwanda's government imposed a marsh-wide ban on farming and grazing from 2008, blocked drainage channels with wood dams to raise the water table, and distributed 28,000 fodder cuttings to affected cattle herders as compensation for the grazing ban. The marsh was Ramsar-listed in 2006 and received a Green Globe Award in 2010 recognising the restoration's success, coordinated by the Rwanda Environment Management Authority (REMA) and the Rwanda Wildlife Conservation Association.

Results

Restoration substantially recovered water levels and hydropower reliability, ending reliance on diesel backup, and biodiversity recovered markedly: the resident grey-crowned crane population — a globally endangered species — rose from about 80 individuals to 273 by 2023.

Conclusions

Some cited economic valuations of the hydropower benefit (around US$100 million) appear in only a single academic source and should be treated as indicative rather than independently verified.

Implementation

Indicative cost
Medium (€50k–€500k) — No aggregate restoration budget disclosed; costs included distribution of 28,000 fodder cuttings as compensation and wood-dam construction to block drainage channels.
Time to results
Long (> 3 years) — Restoration measures implemented from 2008; grey-crowned crane recovery tracked through 2023, an ongoing 15+ year programme.
Staffing & skills
Rwanda Environment Management Authority (REMA), Rwanda Wildlife Conservation Association (RWCA)

Conditions for success

  • Government-enforced marsh-wide farming and grazing ban (from 2008)
  • Physical restoration works (wood dams blocking drainage channels)
  • Compensation for affected herders (28,000 fodder cuttings)
  • Ramsar listing (2006) and international recognition (2010 Green Globe Award)

Common failure modes

  • A cited US$100 million hydropower valuation is single-sourced and not independently verified

Where it fits

Governance type
national environment authority-led restoration with community compensation
Scale
6,735-hectare peatland feeding two hydropower-linked lakes
Income level
low-income (Rwanda)

Commonly funded by

National / regional programmes

Indicative funding routes for practices of this type — always check each programme's current calls and eligibility rules.

Do you run this practice? Claim it — verified implementers get a public contact pathway and can propose corrections.

Data sources

Where this practice's information was retrieved from, and when.