evidoria

← Back to browse

Good practice Imported

TransMilenio — Bogotá's High-Capacity BRT: A Positive Ex-Post Cost-Benefit Evaluation and Documented Service-Quality Strain

Colombia · Bogotá · See the Colombia profile · See the Bogotá profile

Top 74% 57/100 · Ask Evidence Copilot about this practice

Bogotá's TransMilenio BRT: closed trunk corridors, public planning, private operators. An ex-post cost-benefit study finds results positive and robust, but notes falling user perception; an earlier study found net costs once spillovers on old buses counted.

TransMilenio — Bogotá's High-Capacity BRT: A Positive Ex-Post Cost-Benefit Evaluation and Documented Service-Quality Strain

Details

Promoter
TransMilenio S.A. / Alcaldía Mayor de Bogotá
Period
2000–present
Keywords
public transport, bus rapid transit, urban mobility

Description

TransMilenio opened in Bogotá in 2000 as a bus rapid transit system with dedicated trunk corridors and feeder services. The city plans and regulates routes; private operators run the buses under concession, and fare collection is handled separately.
Evidence: Hidalgo, Pereira, Estupiñán and Jiménez (Research in Transportation Economics, 2012) carried out an ex-post cost-benefit analysis monetising travel time, travel cost, road safety and air quality, plus impacts on crime, land values, employment and tax revenue, and conclude results are positive and robust. A World Bank/ESMAP good-practice case study reports a 32% reduction in overall travel time, a 92% drop in accident rates on served corridors and a 40% cut in emissions linked to scrapping older buses; these are secondary-source figures.
Cautionary findings: Echeverry, Ibáñez, Moya and Hillón (2005) found the first phase positive on its own but negative once spillovers were included, mainly longer travel times for people still using the traditional bus system. Hidalgo et al. also note that user perception has declined, that service improvements are urgently needed, and that expansion should limit construction capital costs.

Read the full analysis: https://www.banrep.gov.co/en/publications-research/working-paper/economics-transmilenio-mass-transit-system

Implementation

Implementation detail (cost, timeline, staffing, conditions for success) is not yet available for this practice.

Do you run this practice? Claim it — verified implementers get a public contact pathway and can propose corrections.

Data sources

Where this practice's information was retrieved from, and when.

Attachments

Similar practices you may find useful