Riyadh's ~120 km Wadi Hanifah, once a dumping and quarrying ground, was cleaned and re-profiled (c. US$1bn, 2001–2010) with a 134-biocell bioremediation plant and native planting. Aga Khan Award 2010; outcomes rest largely on designer-reported figures.

Wadi Hanifah Restoration — Riyadh's Dumping-Ground Valley Rebuilt as a Bioremediated River Park (Saudi Arabia)

Details

Promoter
Arriyadh Development Authority (ADA)
Period
2001–2010 (tributary works ongoing)
Keywords
urban, water, bioremediation, river restoration, wastewater, nature-based solutions

Description

Wadi Hanifah is the main natural drainage valley of Riyadh, running roughly 120 km through and past the city. By the 1990s segments were used for dumping of domestic and commercial waste, quarrying and soil extraction, while seasonal floods spread pollutants and left stagnant pools near homes.
The Arriyadh Development Authority adopted a strategy for the wadi in 1994 and commissioned a Comprehensive Development Plan in 2001 from Moriyama & Teshima Planners with Buro Happold. Works completed in 2010 removed about 17.7 million cubic feet of waste, re-profiled some 43.5 miles of river corridor, created five lakes and a 31-mile river park corridor, and built a bioremediation facility of 134 biocells in three ponds that treats urban wastewater by aeration and plant-based processes. Total spending is reported at around US$1 billion.
The Landscape Architecture Foundation case study (2015) reports 115 acres re-naturalised with indigenous plants, about 47 further acres of self-propagated vegetation (2010–2015), on-site observations of 15 bird, 9 fish, 3 mollusc, 2 amphibian and 3 reptile species, and roughly 28,000 newly planted trees. The project received the Aga Khan Award for Architecture in the 2008–2010 cycle.
Caution: most outcome figures are designer- or client-reported with no independent baseline, and sources disagree on the facility's treatment capacity (from 150,000 to 600,000 m³/day). The case study notes lack of local restoration expertise, deteriorating finishes and that tributary works were still unfinished.

Read the full analysis: https://www.thenationalnews.com/uae/science/riyadh-cleans-up-the-natural-way-1.569676

Implementation

Implementation detail (cost, timeline, staffing, conditions for success) is not yet available for this practice.

Do you run this practice? Claim it — verified implementers get a public contact pathway and can propose corrections.

Data sources

Where this practice's information was retrieved from, and when.

Attachments

Similar practices you may find useful