Sélune Dam Removals — Europe's Largest Dam Demolition, Followed by a 15-Year INRAE Monitoring Programme (Normandy, France)
France
France removed the 36 m Vezins dam (2019-2020) and the 16 m La Roche-Qui-Boit dam (2022-2023) on the Sélune. INRAE …
Japan · Yatsushiro · See the Japan profile
Top 72% 33/100 · Ask Evidence Copilot about this practice
Kumamoto Prefecture removed the 25 m Arase hydropower dam (2012-2018), Japan's first full concrete dam removal. Studies found channel changes within about 4 km of the site, new gravel-bar habitat and more fast-water invertebrates, but no significant effect on estuary benthos.
The Arase Dam was a 25 m high gravity dam with a 210.8 m crest and movable gates, built by Kumamoto Prefecture on the Kuma River at Yatsushiro. It began producing power in 1954 and at first met 16% of the prefecture's electricity demand, a share that fell steadily over time. After local calls for its removal, the prefecture chose removal when the dam's water rights expired in 2010. The gates were opened, and demolition by staged blasting ran from April 2012 to March 2018. It was Japan's first full removal of a concrete dam and won the Japan Federation of Construction Contractors' civil engineering award.
Measured effects: analysis of monitoring-camera images showed the water level at the dam site fell by about 4 m. Changes to the main river channel were confined to about 4 km upstream and downstream, and the river bed below a downstream weir became sandier with no silt deposits (Morii et al., 2020). After a flood in June 2015, a new gravel bar formed downstream. It increased shallow habitat, raised average baseflow velocity by about 1.8 times, and increased invertebrate species that prefer faster currents. Flow seeping through the bar fed a backwater with higher species richness than before (Kobayashi et al., 2016). Environmental-DNA work also suggested ayu habitat was recovering in the former reservoir section.
Caveats: a 2011-2018 survey of the Kuma and Mae river estuaries (14 surveys, 138 sites) concluded that the removal probably had no significant impact on the estuarine benthic community. Sediment became coarser and infaunal species increased in 2012-2014, but the authors say the link to the dam removal is not fully verified (Koyama et al., 2022). Physical recovery is well documented, while biological gains are local and modest. The prefecture compiled an environmental monitoring report in 2020. Severe flooding in July 2020 hit Hitoyoshi upstream, but the evaluators found the removal had not contributed to inundation around the former dam site.
Read the full analysis: https://www.nikkenren.com/publication/ACe/ce/ace2105/pdf/p30-31_202105.pdf
Implementation detail (cost, timeline, staffing, conditions for success) is not yet available for this practice.
Do you run this practice? Claim it — verified implementers get a public contact pathway and can propose corrections.
Where this practice's information was retrieved from, and when.
France
France removed the 36 m Vezins dam (2019-2020) and the 16 m La Roche-Qui-Boit dam (2022-2023) on the Sélune. INRAE …
Finland
A recreation-area foundation bought and removed three century-old hydropower dams on the Hiitolanjoki (2021-2023). Salmon nests appeared within weeks, and …
Estonia
Estonia bought (€1.3m) and demolished the 4.5 m Sindi dam, the first barrier on the Pärnu River, in 2018 under …
Spain
A 7 m high, 24 m wide hydropower dam on the Ritort was demolished in 2020 after its concession expired, …