Equitable Payments for Watershed Services (EPWS) — Uluguru Mountains, Tanzania
Tanzania
A 2008–2012 CARE/WWF pilot paid upstream farmers in Tanzania's Uluguru Mountains — source of 90% of Dar es Salaam's water …
Brazil · Nazaré Paulista · See the Brazil profile
Evidence: Observational / pre–post Top 47% 47/100 · Ask Evidence Copilot about this practice
Brazil's pioneering Water Producer scheme, piloted 2008–2015 in São Paulo's Cantareira system, signed 41 PES contracts covering 342 hectares of forest restoration and soil conservation, paying landowners US$6–31/ha/year to protect water for 15 million residents.
In 2004, Brazil's national water agency (Agência Nacional de Águas, ANA) designed the Water Producer Programme (Produtor de Água) — the country's first scheme channeling statutory watershed-committee water-use charges into payments for forest restoration. The Cantareira pilot operated in the Nazaré Paulista and Joanópolis catchments of the PCJ basin, part of the system supplying about 15 million residents across the São Paulo and Campinas metropolitan regions.
Establish a replicable payments-for-ecosystem-services (PES) model that finances watershed restoration — riparian forest restoration, soil conservation and forest conservation — by paying rural landowners to protect water-supply catchments.
Between 2008 and 2015, 41 PES contracts were signed with landowners across 125 rural properties (about 2,898 ha), paying US$6.25–US$31.25 per hectare per year for riparian forest restoration, soil conservation and forest conservation practices.
The programme delivered 342.4 hectares under contract — about 39% of its original target — comprising 64.2 ha of riparian forest restoration, 90.8 ha of soil conservation and 187.4 ha of forest conservation. About US$49,250 (roughly 50%) of budgeted landowner payments was disbursed, and overhead spending was roughly 12 times higher than the PES payments themselves. Separate modeling by WRI/TNC estimated that restoring 4,000 hectares could reduce sediment loads by about 36%, with a modeled 28% return on investment for the water utility SABESP.
The pilot's modest contracted area relative to its target and its high overhead-to-payment ratio are limitations documented in the peer-reviewed literature; despite these constraints, the PES model has since been replicated by dozens of Brazilian municipalities.
National / regional programmes
Indicative funding routes for practices of this type — always check each programme's current calls and eligibility rules.
Do you run this practice? Claim it — verified implementers get a public contact pathway and can propose corrections.
Where this practice's information was retrieved from, and when.
Tanzania
A 2008–2012 CARE/WWF pilot paid upstream farmers in Tanzania's Uluguru Mountains — source of 90% of Dar es Salaam's water …
United States of America
After 1996 and 2002 wildfires choked Denver's reservoirs with sediment, Denver Water and the US Forest Service treated 120,000+ acres …
Australia
Melbourne has kept the public and farming out of its mountain-ash forest catchments since 1879, so over 65% of its …
Peru
Since 2008, a one-sol water-tariff surcharge in Moyobamba has funded reforesting 400 ha across three microwatersheds feeding the city's supply, …
Open full copilot Grounded in cited practices — always check the sources.