evidoria

← Back to browse

Good practice Imported

Cody Rouge Green Stormwater Infrastructure — Turning Detroit Vacant Lots into Rain Gardens

United States of America · Detroit · See the United States of America profile

Top 76% 33/100 · Ask Evidence Copilot about this practice

DWSD and the Detroit Land Bank Authority turned four Cody Rouge vacant lots into bioretention gardens in 2015, each capturing up to 300,000 gallons of stormwater a year underground — DWSD's first land-bank project, under a $15M NPDES-permit investment (2013–2017).

Details

Promoter
Detroit Water and Sewerage Department (DWSD) & Detroit Land Bank Authority, with University of Michigan (NEW-GI)
Period
2015–present
Keywords
stormwater management, land bank, urban greening, public health

Description

In November 2015, the Detroit Water and Sewerage Department (DWSD) built its first green stormwater infrastructure project on Detroit Land Bank Authority vacant land: four bioretention rain gardens on vacant lots in the Cody Rouge neighbourhood on the city's west side, designed by a University of Michigan team led by Professor Joan Nassauer. It was the first DWSD–Land Bank collaboration of its kind.
Each garden is engineered to capture up to 300,000 gallons of stormwater underground per year, roughly 1.2 million gallons across the four lots combined, reducing combined-sewer overflow into the Rouge River watershed. The project sits within a broader, permit-driven commitment: DWSD's federal NPDES permit required $15 million of green stormwater infrastructure investment between 2013 and 2017 to cut 2.8 million gallons of stormwater flow during the two-year design storm.
A follow-up University of Michigan research programme (Neighborhood, Environment and Water — Green Infrastructure, “NEW-GI”) studied resident perceptions of different vacant-lot greening designs and their relationship to depressive symptoms and household flooding; planted bioretention designs scored significantly better than unmanaged control lots on perceived home value, safety and neighbourhood interaction.
The Cody Rouge project itself remains small in scale — four lots — relative to Detroit's tens of thousands of vacant parcels, and the sources found document this specific pilot's engineering and perception outcomes rather than a citywide gallons-captured total, so its evidence should be read as a validated design model rather than a fully scaled citywide result.

Read the full analysis: https://nextcity.org/urbanist-news/detroit-vacant-lots-green-stormwater-infrastructure

Implementation

Implementation detail (cost, timeline, staffing, conditions for success) is not yet available for this practice.

Do you run this practice? Claim it — verified implementers get a public contact pathway and can propose corrections.

Data sources

Where this practice's information was retrieved from, and when.

Similar practices you may find useful