A $200M World Bank programme building drains, retention basins and river dredging to protect Accra's flood-prone informal settlements. An independent interim evaluation found no significant flood reduction yet; the project was restructured and extended to 2027.
The World Bank's Board approved the Greater Accra Resilient and Integrated Development (GARID) project in 2019, committing an initial $200 million to combine drainage and flood-control infrastructure with support for informal-settlement upgrading in flood-prone parts of Accra, Ghana, including the Odaw River basin neighbourhoods of Nima, Agbogbloshie and Akweteyman.
Physical works under GARID include dredging of the Odaw River, construction of new stormwater drains, roads and water networks, and flood-retention basins that provide temporary storage for excess rainwater alongside nature-based measures. By mid-2024, drain, road and water-network construction was reported more than 60% complete in Nima, about 50% in Agbogbloshie, and nearly half finished in Akweteyman.
An independent interim impact evaluation by the International Growth Centre compared flooding conditions in GARID-targeted neighbourhoods against similar non-GARID areas and found no statistically significant reduction in flooding at that stage, even as construction progressed. In response, the project was restructured and its closing date extended to 2027 to complete outstanding works; as of an April 2025 update GARID continued to report broad stakeholder support for its ongoing flood-resilience and solid-waste interventions.
Read the full analysis: https://www.theigc.org/publications/interim-impacts-integrated-resilient-development-project-case-accra-ghana
Implementation detail (cost, timeline, staffing, conditions for success) is not yet available for this practice.
Do you run this practice? Claim it — verified implementers get a public contact pathway and can propose corrections.
Where this practice's information was retrieved from, and when.
Iceland
Since 2007, Iceland's Hekluskógar project has enlisted 210+ landowners to re-establish native birch woodland around the Hekla volcano, planting 2.3M+ …
United States of America
A 50/50 USACE-SFWMD project backfilled 22 miles of the C-38 flood-control canal and re-carved 44 miles of the Kissimmee River's …
Denmark
Denmark re-meandered the channelised Skjern River from 19 to 26 km across 875 ha of rewetted floodplain (2001-2004), an EU …
Greece
After the July 2023 Rhodes wildfires, the EU's Copernicus Emergency Management Service mapped burn severity across ~17,600 ha within days, …
Open full copilot Grounded in cited practices — always check the sources.