PROMEBA — Argentina's National Neighbourhood-Upgrading Programme, With a Matched Evaluation of 169 Neighbourhoods

Argentina · Buenos Aires · See the Argentina profile · See the Buenos Aires profile

Top 49% 67/100 · Ask Evidence Copilot about this practice

IDB-financed since 1997, PROMEBA has upgraded villas in 629 projects reaching ~213,000 families. A 2020 matched study of 169 neighbourhoods found sewer connection up 10 points and residential satisfaction up 20, but tenure security up only 4 points.

Details

Promoter
Programa de Mejoramiento de Barrios (PROMEBA), Government of Argentina, with the Inter-American Development Bank
Period
1997–present
Keywords
informal settlements, neighbourhood upgrading, land regularisation, sanitation, urban infrastructure

Description

PROMEBA (Programa de Mejoramiento de Barrios) has run since 1997 as Argentina's national, IDB-financed programme for upgrading villas and informal settlements in place. It combines four components: land legalisation; infrastructure, facilities and environmental sanitation; building social and human capital; and strengthening management capacity. It has been delivered in successive phases (PROMEBA I to V), and the IDB approved the PROMEBA V loan on 6 July 2022.
A 2020 master's evaluation at Universidad Torcuato Di Tella reports 629 projects reaching about 213,000 families. It used two-stage propensity-score matching to compare 53 treated neighbourhoods (5,766 households) with 116 not-yet-treated neighbourhoods (13,688 households), linked to the 2010 census.
The study found statistically significant effects on several outcomes. Sewer connection rose from 29% to 39% of dwellings and residential satisfaction from 31% to 51%. Overcrowding fell from 43% to 36%, and perceived safety in squares rose from 37% to 57%. Ratings of the local environment, squares, lighting and bus frequency also improved.
Caveats: the gain in legal tenure security was small (22% to 26%), consistent with the long lag between works and the handover of title deeds. No baseline surveys were run before the intervention, the first neighbourhoods were not selected at random and were measurably more vulnerable, and the author treats the lack of a true control group as the main limitation. The programme shows that integrated in-situ upgrading can be sustained for decades at national scale, while titling remains its weakest link.

Read the full analysis: https://repositorio.utdt.edu/items/ee5a8e70-f1c6-4259-bd85-ad48090ef729

Implementation

Implementation detail (cost, timeline, staffing, conditions for success) is not yet available for this practice.

Do you run this practice? Claim it — verified implementers get a public contact pathway and can propose corrections.

Data sources

Where this practice's information was retrieved from, and when.

Similar practices you may find useful