GeoCitizen — Participatory GIS Land-Use Planning for Quito's Ilaló Mountain
Ecuador
Quito's planning authority and an Austrian/Ecuadorian/CIAT research team used the GeoCitizen participatory-GIS platform to run a 2013 land-zoning process on …
Honduras · Tegucigalpa · See the Honduras profile · See the Tegucigalpa profile
Evidence: Observational / pre–post Top 66% 62/100 · Ask Evidence Copilot about this practice
Honduras' CoST-backed SISOCS portal grew from 13 disclosed infrastructure projects in 2014 to 2,038 projects worth US$1.1bn by 2021, lifting mandated data disclosure from 27% to about 95% and training over 500 citizen monitors — before CoST Honduras' membership went inactive in 2
Honduran infrastructure procurement suffered chronically poor public disclosure until a 2015 executive decree made publishing data under the CoST Infrastructure Data Standard mandatory for government contracting bodies.
CoST Honduras, working with the World Bank, built SISOCS as a subsystem of the national procurement portal to make infrastructure project data proactively public and open it to citizen verification.
Nine main procuring entities began publishing structured project data on SISOCS, later joined by a companion PPP-tracking portal, with trained citizen volunteers and professional observers cross-checking disclosures against original documents and site visits, following the international OC4IDS standard.
Proactive disclosure rose from 27% in 2014-15 to roughly 95% in later assurance reports, published projects grew from 13 to 2,038 worth over US$1.1 billion, and cost-overrun data coverage rose from 40% (2015) to 95% (2017). The disclosed data drove concrete accountability outcomes, including the dismantling and rebuilding of the Road Fund agency after organised-crime links surfaced in its procurement records, exposure of a US$517 million liability in a tourist-corridor PPP against US$162 million of private investment, and a new mandatory design-update rule after 60% of reviewed road designs were found to rely on outdated plans.
Despite this measured track record, CoST Honduras became an inactive network member in 2023 and formally withdrew in 2024, illustrating that even well-evidenced transparency infrastructure can lose institutional and political backing without durable, legally-mandated funding.
National / regional programmes
Indicative funding routes for practices of this type — always check each programme's current calls and eligibility rules.
Do you run this practice? Claim it — verified implementers get a public contact pathway and can propose corrections.
Where this practice's information was retrieved from, and when.
Ecuador
Quito's planning authority and an Austrian/Ecuadorian/CIAT research team used the GeoCitizen participatory-GIS platform to run a 2013 land-zoning process on …
Peru
Since 2010, Lima Cómo Vamos has surveyed ~2,000 residents of Metropolitan Lima annually on urban quality of life. A 2022 …
Tanzania
Dar es Salaam's Ramani Huria trained 450 community members and students to map flood-prone informal settlements with OpenStreetMap and drones. …
Colombia
Since 1997, a business–media–academia coalition has tracked Bogotá's quality of life through annual citizen perception surveys and an open indicators …
Open full copilot Grounded in cited practices — always check the sources.