World Bank-backed Sites and Services projects surveyed and serviced plots in seven Tanzanian cities in the 1970s–80s. A spatial RD study in the JPE finds planned greenfield areas grew into far better neighbourhoods than upgraded squatter areas.
In the 1970s and 1980s the Tanzanian government and the World Bank co-financed two rounds of Sites and Services projects in Dar es Salaam and six secondary cities: Iringa, Morogoro, Mbeya, Mwanza, Tabora and Tanga. The projects created 12 'de novo' neighbourhoods on unbuilt land and upgraded 12 existing squatter settlements. In both cases they surveyed plots and built basic infrastructure, mainly unpaved roads, roadside drainage and in some places water mains, and households then built their own homes.
Michaels, Nigmatulina, Rauch, Regan, Baruah and Dahlstrand (Journal of Political Economy, 2021; IZA DP 11036) compare the de novo areas with nearby control areas that were also unbuilt before the projects, using a spatial regression-discontinuity design. They draw on satellite imagery and building surveys in Mbeya, Tanga and Mwanza. Three decades on, de novo buildings have larger footprints and more regular layouts, and are more likely to have several storeys, electricity, better sanitation and road access. Upgraded squatter areas look similar to the controls or worse.
Infrastructure cost per square metre was almost the same in both models: about US$2.20 for de novo areas and US$2.37 for upgrading (2017 dollars). In Dar es Salaam, though, land in de novo areas was worth about US$160–220 per m², against US$30–40 in upgraded areas. By 2002 the neighbourhoods housed a little over half a million people.
The cautionary side: the poorest households often could not afford the de novo plots, and adults in those areas have about two more years of schooling than adults in the control areas. The authors show that this sorting explains little of the gap in housing quality. The World Bank stopped using Sites and Services as a main urban-lending channel from the late 1980s, and the comparison for upgraded areas is descriptive rather than causal. Still, it is one of the strongest long-run tests of 'planning ahead' for fast-growing African cities.
Read the full analysis: https://www.iza.org/publications/dp/11036
Implementation detail (cost, timeline, staffing, conditions for success) is not yet available for this practice.
Do you run this practice? Claim it — verified implementers get a public contact pathway and can propose corrections.
Where this practice's information was retrieved from, and when.
Georgia
Since 2019, Georgia and the Asian Development Bank have run a $135m participatory planning programme — a 172-stakeholder national visioning …
Saudi Arabia
Saudi Arabia's flagship linear megacity, budgeted at $500bn, has built roughly 1.4% of its planned 170km structure and is being …
United States of America
In July 2017, 15 volunteer teams in Richmond, Virginia logged 60,000+ car-mounted temperature readings, finding 15–20°F intra-city gaps that helped …
Vietnam
A decade-long World Bank-financed programme upgraded drainage, roads and utilities in low-income alleys across Ho Chi Minh City and three …