Space to Grow — Chicago's Co-Funded Green Schoolyards Capturing Stormwater, Where USGS Monitoring Found 100% Capture at One School and 27.5% at Another (USA)
Since 2014, Chicago has rebuilt 41+ asphalt schoolyards as green, permeable play spaces designed to hold 200,000+ gallons per storm each. USGS monitoring at two schools found 100% capture at one and 27.5% at the other.
Details
Promoter
Metropolitan Water Reclamation District of Greater Chicago (MWRD), Chicago Public Schools, Chicago Dept. of Water Management, Healthy Schools Campaign & Openlands
Period
2014–present
Keywords
green schoolyards, stormwater, green infrastructure, education, urban greening
Description
Space to Grow turns worn asphalt Chicago Public Schools yards into green schoolyards with gardens, permeable surfaces, turf fields and underground storage. The goal is to keep stormwater out of the city's combined sewer system while creating places for play and outdoor learning. Three public capital partners fund construction: the Metropolitan Water Reclamation District (MWRD), Chicago Public Schools and the Chicago Department of Water Management. The Healthy Schools Campaign and Openlands raise funds for and manage community engagement and other non-construction work. MWRD reports more than 41 schoolyards completed since 2014, with design storage averaging over 200,000 gallons per rain event per site (for example 253,902 gallons at Grissom Elementary) and nearly 8.8 million gallons in total. In March 2024 MWRD approved up to $15.9 million more through 2026. The measured evidence is more mixed than the design figures. A USGS study (Bailey, Soderstrom & Duncker, Scientific Investigations Report 2024-5036) monitored two schools from September 2016 to July 2017. Grissom Elementary recorded no discharge from its green-infrastructure sewer lines (100% capture). At Morrill Math and Science School, only 27.5% of water was captured and 72.5% went to the sewer. Lesson: pooling utility, school and city capital budgets can scale schoolyard greening quickly. But performance varies widely by site, so citywide gallon totals are design capacity, not verified retention.
Read the full analysis: https://mwrd.org/stormwater/space-to-grow
Implementation
Implementation detail (cost, timeline, staffing, conditions for success) is not yet available for this practice.
Do you run this practice?
Claim it —
verified implementers get a public contact pathway and can propose corrections.
Data sources
Where this practice's information was retrieved from, and when.
Seattle Public Utilities rebuilt a residential block (completed 2001) with vegetated swales instead of piped drainage. Two years of SPU/EPA-documented …