After the 1957 flood the Turia was diverted south of Valencia and the dry riverbed became a ~9–10 km linear park of roughly 110–130 ha; the diversion channel nearly filled in the Oct 2024 DANA yet the historic centre stayed dry.

Turia Gardens — Valencia's Flood-Diverted Riverbed Turned into a 9-km Linear Park

Details

Promoter
Ajuntament de València (Valencia City Council)
Period
1961-present
Keywords
urban greening, flood risk, public space, nature-based solutions

Description

After the catastrophic Turia flood of 1957 (official toll at least 81 deaths, unofficial estimates up to ~300), the river was diverted into a new 12-km channel up to 175 m wide south of Valencia (Plan Sur, completed by 1969). A highway was planned for the abandoned riverbed, but a citizen movement under the slogan 'The river is ours and we want it green' won it as public parkland, developed from the 1980s (Ricardo Bofill designed the final section).
The Jardín del Turia now runs about 9–10 km through the city on roughly 110–130 ha (sources differ), listing around 40 tree species and 70 bird varieties; the park is owned by Valencia City Council with national-government land transfer, and maintained by municipal gardeners plus private contractors. An extension (Parc de Desembocadura, +100,000 m²) is under way.
During the 29–30 October 2024 DANA storm, nearly a year's rain fell in about eight hours; the diversion channel reached near capacity and the historic centre did not flood. Important caveat: the worst-hit areas were suburbs south of the city, beyond the diversion's protection, so the flood benefit is local, and it comes from the engineered channel rather than the park itself. No published carbon, biodiversity or cooling metrics were found, so those dimensions are scored low.

Read the full analysis: https://www.interregeurope.eu/good-practices/turia-garden

Implementation

Implementation detail (cost, timeline, staffing, conditions for success) is not yet available for this practice.

Do you run this practice? Claim it — verified implementers get a public contact pathway and can propose corrections.

Data sources

Where this practice's information was retrieved from, and when.

Attachments

Similar practices you may find useful