WETLIFE 2 — Hydrological Restoration of the Amalva and Kamanos Raised Bogs (Lithuania)

Lithuania · Marijampolė · See the Lithuania profile

Evidence: Observational / pre–post Top 17% 60/100 · Ask Evidence Copilot about this practice

WETLIFE 2 (LIFE13 NAT/LT/000084, 2014–2018, €1.56M) rewetted Lithuania's Amalva and Kamanos raised bogs — blocking ~37 km of drainage ditches at Kamanos and raising 6.6 km of dykes at Amalva — targeting recovery of ~775 ha of active raised-bog vegetation for rare mire species.

1,564,386 EUR
Total project budget (2014-2018)
1,173,289 EUR
EU co-financing (2014-2018)
~37 km
Drainage ditches blocked at Kamanos (2014-2018)
~670 ha
Mire habitat rewetted at Kamanos (2014-2018)
40 ha
Lag-zone fen restored at Kamanos (2014-2018)
6.6 km
Perimeter dykes raised/rebuilt at Amalva (2014-2018)
>20 ha
Underground drains blocked at Amalva (2014-2018)
>140 ha
Encroaching trees cleared at Amalva (2014-2018)
~775 ha
Targeted active raised-bog regeneration (2014-2018)

Details

Maturity
Established
Promoter
VšĮ Gamtos paveldo fondas (Nature Heritage Fund) / Kamanos State Nature Reserve Directorate / Žuvintas Biosphere Reserve Directorate / Marijampolė Municipality Administration
Period
2014-2018
Region (NUTS)
LT02
Keywords
peatland hydrological restoration, raised bog rewetting, EU LIFE programme, mire biodiversity

Context

Amalva and Kamanos are two of Lithuania's most significant raised-bog and transitional-mire complexes, both long degraded by peat-extraction-era drainage networks. Between July 2014 and October 2018, the EU co-funded WETLIFE 2 project (LIFE13 NAT/LT/000084; total budget EUR 1,564,386, of which EUR 1,173,289 was EU co-financing) restored their hydrology, coordinated by the Nature Heritage Fund with the Kamanos State Nature Reserve Directorate, the Zuvintas Biosphere Reserve Directorate and Marijampole Municipality Administration.

Activities

At Kamanos, the project blocked approximately 37 km of drainage ditches to rewet around 670 ha of mire habitat and restore a further 40 ha of lag-zone fen. At Amalva, works raised or rebuilt 6.6 km of perimeter dykes, constructed two spillways and a dam, blocked over 20 ha of underground drains, and cleared encroaching trees from more than 140 ha, targeting regeneration of active raised-bog vegetation on approximately 775 ha, plus 26 ha of bog woodland and 6 ha of restored wet meadow. Water-level monitoring equipment was installed at both sites, and sustainable land-management practices were agreed with local farmers.

Results

The engineering interventions and habitat-area targets are verified through the official European Commission LIFE project registry. No independently published post-project ecological or carbon outcome study has been found for either site; the project's After-LIFE Conservation Plan commits the partners to continued monitoring.

Conclusions

These figures describe verified engineering interventions and habitat-area targets rather than an independently confirmed ecological or carbon outcome. The long-term ecological result should be treated as targeted and engineering-verified rather than fully outcome-confirmed.

Implementation

Indicative cost
Medium (€50k–€500k) — EUR 1,564,386 total budget (2014-2018), of which EUR 1,173,289 (about 75%) was EU LIFE co-financing.
Time to results
Medium (1–3 years) — 4-year project (July 2014-October 2018) with continued monitoring commitments under the After-LIFE Conservation Plan.
Staffing & skills
Nature Heritage Fund (VsI Gamtos paveldo fondas) - project coordinator, Kamanos State Nature Reserve Directorate, Zuvintas Biosphere Reserve Directorate, Marijampole Municipality Administration

Conditions for success

  • EU LIFE co-financing (~75% of budget) enabling capital-intensive hydrological engineering works
  • Four-partner consortium spanning a conservation NGO, state nature reserve directorates and a municipal administration
  • Water-level monitoring equipment installed at both sites to track post-restoration hydrology
  • Sustainable land-management practices agreed with local farmers
  • An After-LIFE Conservation Plan committing partners to continued monitoring beyond project end

Common failure modes

  • No independently published post-project ecological or GHG outcome data exists yet, so the long-term success of the rewetting is not yet demonstrated beyond the delivered engineering works

Where it fits

Governance type
EU-co-funded multi-partner consortium (NGO plus state reserve directorates plus municipality)
Scale
two sites, roughly 700-800 ha each
Income level
high income (EU, Lithuania)

Commonly funded by

LIFE Programme National / regional programmes

Indicative funding routes for practices of this type — always check each programme's current calls and eligibility rules.

Do you run this practice? Claim it — verified implementers get a public contact pathway and can propose corrections.

Data sources

Where this practice's information was retrieved from, and when.

Similar practices you may find useful