Kampinos WetLIFE — Rewetting the Kampinos Forest Natura 2000 Site (Poland)

Poland · Kampinos · See the Poland profile

Evidence: Descriptive / self-reported Top 39% 53/100 · Ask Evidence Copilot about this practice

A EUR5m+ EU LIFE and Polish state-funded project is rewetting 6,141.5 ha of Natura 2000 habitat in Kampinos Forest near Warsaw by building 27 dams and naturalising over 8,000 m of drainage channels to reverse 19th-century desiccation.

6,141.5 ha
Natura 2000 habitat area targeted for groundwater rewetting (2020-2026)
27 dams
Permanent dams built (main + secondary channels) (2020-2026)
35 ponds
New ponds created (2020-2026)
>8,000 m
Drainage channels naturalised (2020-2026)
108 ha
Meadow restored to low-intensity farming (2020-2026)
80 ha
Land planned for conservation purchase (2020-2026)
>5 EUR million
Total project budget (2020-2026)

Details

Maturity
Scaling
Promoter
Kampinos National Park & Regionalne Centrum Ekologiczne (REC Polska), co-funded by the EU LIFE Programme and Poland's National Fund for Environmental Protection and Water Management
Period
2020-2026
Keywords
wetland restoration, hydrology, Natura 2000 habitat management, public works

Context

Kampinos Forest, immediately west of Warsaw, was extensively drained by channel-digging that began in the mid-19th century, desiccating its marshes and pushing out rare wetland plants and animals. Kampinos WetLIFE (LIFE19 NAT/PL/000746, 2020-2026) is the second EU LIFE project targeting this Natura 2000 site, led by Kampinos National Park with REC Polska, and financed by the EU LIFE+ fund together with Poland's National Fund for Environmental Protection and Water Management, at a total budget exceeding EUR5 million.

Objectives

The project aims to raise groundwater levels across 6,141.5 hectares of Natura 2000 habitat by reversing 19th-century drainage, alongside restoring low-intensity farming, controlling invasive species, and planned land purchase for conservation.

Activities

The project's central engineering works are 15 permanent dams on the forest's three main watercourses (the Lasica, L9 and Zaborowski channels) plus 12 further dams on secondary channels, the creation of 35 new ponds, and naturalisation of more than 8,000 metres of previously straightened drainage channels. Monitoring includes LiDAR-based elevation mapping of the forest to model water flow, plus ongoing groundwater and channel-flow measurement; land-management components include restoring extensive, low-intensity farming on 108 hectares of meadow, invasive-species control, and a planned purchase of 80 hectares of land for conservation.

Results

As the project runs to 2026, most reported figures to date are engineering targets and installed-infrastructure counts (27 dams, 35 ponds, 8,000+ m of naturalised channels) rather than final ecological outcome data (species recovery, water-table trends); independent post-project evaluation has not yet been published.

Implementation

Indicative cost
Medium (€50k–€500k)
Time to results
Medium (1–3 years)

Commonly funded by

LIFE Programme National / regional programmes

Indicative funding routes for practices of this type — always check each programme's current calls and eligibility rules.

Do you run this practice? Claim it — verified implementers get a public contact pathway and can propose corrections.

Data sources

Where this practice's information was retrieved from, and when.

Similar practices you may find useful