Since 2006, Kounkuey Design Initiative has co-designed 11 flood-resilient public spaces with Kibera residents on reclaimed dumpsites, installing 520m of flood protection and 840m of drainage, and reaching over 125,000 of the settlement's residents.
11
Flood-resilient public spaces built
35%
Share of purpose-built public space in Kibera
520 metres
Flood protection installed
840 metres
Drainage infrastructure installed
125,000+
Residents reached
5,000+
Residents directly involved in design processes
Details
Maturity
Established
Promoter
Kounkuey Design Initiative (KDI)
Period
2006–present
Keywords
informal settlement upgrading, climate resilience, urban design, public space
Context
Kibera, Nairobi's largest informal settlement, is home to an estimated 300,000+ residents and has historically lacked formal public infrastructure; flooding, poor drainage and informal dumping sites have created recurring public-health and safety hazards.
Objectives
Kounkuey Design Initiative (KDI), a non-profit founded through a 2006 partnership with the New Nairobi Dam Community Group, developed a 'productive public space' model: reclaiming polluted or dumped-on land through community-led design, construction and long-term co-management, combining flood-mitigation infrastructure with civic and income-generating uses, without displacing existing housing.
Activities
Government recognition has grown progressively: a 2016 memorandum of understanding with Nairobi County's Department of Public Works, a 2018 partnership with the Kenya Meteorological Department, and 2020 approval of the Kibera Special Planning Area by Nairobi Metropolitan Services.
Results
Per the WRI Ross Center for Sustainable Cities' 2020-2021 Prize for Cities evaluation, the network comprised 11 public spaces - 35% of all purpose-built public space in Kibera - including 520 metres of flood protection and 840 metres of drainage infrastructure. The network reaches over 125,000 residents through improved service access and flood protection, with roughly 10,000 people per day using it, and more than 5,000 residents were directly involved in design processes.
Conclusions
KDI's approach was later adapted for Kenya's Kalobeyei refugee settlement, indicating cross-context transferability. Publicly available cost data and rigorous counterfactual impact evaluations remain limited, which this entry records honestly rather than overstating the evidence base.
Implementation
Indicative cost
Medium (€50k–€500k)
Time to results
Long (> 3 years)
Staffing & skills
Kounkuey Design Initiative (KDI) non-profit team, community co-design and long-term co-management by residents
Conditions for success
Community-led design, construction and long-term co-management
Reclaiming polluted/dumped land without displacing existing housing
Progressive formal government recognition (MOUs, planning-area status) building on early community trust
Commonly funded by
Philanthropic / foundation fundingNational / regional programmes
Indicative funding routes for practices of this type — always check each programme's current calls and eligibility rules.
Do you run this practice?
Claim it —
verified implementers get a public contact pathway and can propose corrections.
Data sources
Where this practice's information was retrieved from, and when.
A 'second-generation' crime-prevention-through-design programme in Cape Town's Khayelitsha township pairs infrastructure upgrading with community safety work; a peer-reviewed 2020 study …