REMA restored 121.7 ha of degraded urban wetland in Kigali into the Nyandungu Eco-Park (2016–2020), replanting 17,000 native trees across …
Spain · Madrid · See the Spain profile · See the Madrid profile
Top 53% 40/100 · Ask Evidence Copilot about this practice
In May 2016 Madrid opened the weir gates on a 7.5 km canalised reach of the Manzanares. Sand bars, islands and willows formed unaided, 50+ bird species were recorded and native barbel became the dominant fish. Peer-reviewed studies confirm the habitat gains.
Madrid canalised the Manzanares in the 20th century and in 1940 built nine weirs that turned its urban stretch into a chain of still, impounded ponds. In 2016 the city council adopted a renaturalisation plan proposed by the NGO Ecologistas en Acción. In May 2016 it opened the gates of all the weirs along 7.5 km of the urban river, letting water and sediment move freely again.
The approach was low-cost and process-based. Once flow resumed, sand bars and small islands formed and were colonised by wild herbaceous plants, and by bulrush, willow and ash that no one planted. A first engineered reach of 1.3 km, between the Puente de los Franceses and the Puente de la Reina Victoria, was completed in May 2018 for €1,216,054. Crews removed invasive tree-of-heaven, lowered part of the riprap and planted about 5,230 native riparian trees and shrubs, with two years of maintenance included.
Monitoring by municipal technicians and Ecologistas en Acción has recorded more than 50 bird species, including newly arrived waders such as the little ringed plover and the common sandpiper, as well as herons and kingfishers. Native barbel became the dominant fish, ahead of introduced carp. GREFA released about 15 Spanish pond turtles (Mauremys leprosa), and the city started captive-breeding trials for three native fish species. A peer-reviewed study (Díaz-Redondo et al., River Research and Applications, 2022) found 'a substantial reactivation of habitat heterogeneity over a short timeframe' and better water quality, creating potential habitat for native fish. A 2024 study in Urban Forestry & Urban Greening found the project improved both ecological quality and recreational attractiveness.
There are limits. The bird and fish figures come from monitoring led partly by the NGO that promoted the project. There is no controlled before–after biodiversity baseline, and the reported species counts span different periods and methods. The weir structures and gates remain in place. In March 2025 Ecologistas en Acción asked for the gates to be removed, saying they no longer serve any function and pose a flood-safety risk. The river remains heavily regulated upstream, and the project stores no measurable carbon.
Read the full analysis: https://www.madrid.es/portales/munimadrid/es/Inicio/Medio-ambiente/Renaturalizacion-del-Rio-Manzanares/?vgnextoid=4b7c4adfddb13810VgnVCM2000001f4a900aRCRD
Implementation detail (cost, timeline, staffing, conditions for success) is not yet available for this practice.
Do you run this practice? Claim it — verified implementers get a public contact pathway and can propose corrections.
Where this practice's information was retrieved from, and when.
Rwanda
REMA restored 121.7 ha of degraded urban wetland in Kigali into the Nyandungu Eco-Park (2016–2020), replanting 17,000 native trees across …
China
Urban wetland park of ~1,100 ha in central Guangzhou, founded 2012 and restored for flyway waterbirds. Recorded bird species rose …
Netherlands
Since 2015 Dutch NGO IVN has planted 200+ tennis-court-sized 'Tiny Forests' nationwide. Wageningen University's citizen-science monitoring recorded 595-636 species across …
Türkiye
Under the EU's URBAN GreenUP project, İzmir stripped concrete from both banks of a Peynircioğlu Stream tributary in Mavişehir and …