EU Horizon 2020's RECONECT project modelled nature-based measures across Serbia's flood-prone Tamnava basin, finding 20-47% reductions in flood extent, volume and damage costs, with retention ponds reaching a 5.6 benefit-cost ratio once co-benefits are counted.
The Tamnava river basin (730 km2, western Serbia, Kolubara District) was repeatedly devastated by floods in 1999, 2006, 2009 and catastrophically in 2014. It was selected as a pilot site under the EU Horizon 2020 RECONECT project (grant 776866, 2018-2021), implemented locally by the Jaroslav Cerni Water Institute, to test whether nature-based solutions could substitute for or complement conventional flood infrastructure.
Researchers modelled four scenarios projected out to 2100: the existing protection system; a green scenario adding new retention ponds and floodplain restoration; a grey scenario raising levees and diverting flood discharge; and a combined green-grey scenario, alongside afforestation/reforestation and obstruction removal.
Modelled results showed flood area reduced by 20-27%, flood volume by 28-35%, and damage costs by 40-47%, depending on retention pond configuration. A cost-benefit analysis found afforestation/reforestation returned a benefit-cost ratio of 3.5 and retention ponds 5.6 once five co-benefits (carbon sequestration, biological pest control, habitat creation, air pollution reduction, education) were added — turning marginally-positive flood measures into strongly positive investments.
These figures come from published hydrological and economic modelling, not yet from monitored outcomes of constructed works; further scale-up depends on land acquisition and municipal follow-through beyond RECONECT's research phase.
Indicative funding routes for practices of this type — always check each programme's current calls and eligibility rules.
Do you run this practice? Claim it — verified implementers get a public contact pathway and can propose corrections.
Where this practice's information was retrieved from, and when.
Sri Lanka
Colombo's remaining marshes, about 17% of the city area, are managed as flood infrastructure holding close to 40% of annual …
United States of America
A 50/50 USACE-SFWMD project backfilled 22 miles of the C-38 flood-control canal and re-carved 44 miles of the Kissimmee River's …
Denmark
Denmark re-meandered the channelised Skjern River from 19 to 26 km across 875 ha of rewetted floodplain (2001-2004), an EU …
Switzerland
In 2002 Swiss authorities removed about 1 km of embankments on the Thur River near Niederneunforn, letting the channel widen …