evidoria

← Retour à la liste

Bonne pratique Importée

Paiements d'agglomération pour la conservation des bassins versants — projet pilote de PSE dans le bassin de la rivière Shire (Malawi)

Malawi · Balaka · Voir le profil de Malawi

Preuves: Essai contrôlé randomisé Top 81% 33/100 · Demandez à Evidence Copilot à propos de cette pratique

Un dispositif de paiements testé par essai randomisé a rémunéré 1 450 à 2 800 exploitants du bassin de la Shire pour adopter l'agriculture de conservation, testant des paiements pour sédiments évités ; résultats intégrés à un programme de la Banque mondiale de 157 M$.

60-63 villages
Villages enrolled in RCT (2014-2016 pilot)
1,800-1,900 households
Households in RCT study (2014-2016 pilot)
1,450 households
Households enrolled, Year 1 (Year 1)
2,800 households
Households enrolled, Year 2 (Year 2)
170 % above control
Increase in conservation-agriculture adoption vs control group (2014-2016 pilot)
7 % of cropped land
Additional cropped land under conservation agriculture (2014-2016 pilot)
7 USD per tonne
Cost-effectiveness of avoided sediment (favourable assumptions) (2014-2016 pilot)
20 USD per tonne
Cost-effectiveness of avoided sediment (with ongoing payments) (2014-2016 pilot)
200 USD per tonne
Cost-effectiveness of avoided sediment (including monitoring costs) (2014-2016 pilot)
157 USD million
World Bank MWASIP scale-up funding (approved June 2020)
95,000 hectares
MWASIP degraded-land restoration target (MWASIP 2020-2026)
250,000+ people
MWASIP direct livelihood-support beneficiaries (first three years of MWASIP)
Paiements d'agglomération pour la conservation des bassins versants — projet pilote de PSE dans le bassin de la rivière Shire (Malawi)

Détails

Maturité
En expansion
Promoteur
Government of Malawi / IFPRI-ESPA Research Consortium (World Bank MWASIP)
Période
2014-2016 pilot; scaled 2020-2026 (MWASIP)
Mots-clés
watershed PES, conservation agriculture, sediment control, hydropower protection, randomized controlled trial

Contexte

Soil erosion from conventional farming in Malawi's upper Shire River Basin (Balaka, Machinga and Zomba districts) loads the river with sediment that damages downstream habitat and silts the reservoirs of hydropower dams supplying over 90% of Malawi's electricity.

Objectifs

Researchers designed the Agglomeration Payments for Catchment Conservation pilot as a randomised controlled trial to test whether hydropower-linked, avoided-sediment payments could increase adoption of conservation agriculture, comparing a standard per-area subsidy against an 'agglomeration' bonus intended to capture the catchment-scale benefit of neighbouring plots adopting together.

Activités

The pilot ran across 60-63 villages (roughly 1,800-1,900 households), funded by the UK-backed Ecosystem Services for Poverty Alleviation programme, USAID's Feed the Future Innovation Lab and CGIAR. Two payment structures were tested: a standard per-area subsidy (1,200 Malawi Kwacha per 0.1 acre) and an 'agglomeration' bonus (600 MKW per 0.1 acre plus 200 MKW per contiguous adopting neighbour). Payments were delivered as agricultural input vouchers.

Résultats

Enrolment rose from about 1,450 households in Year 1 to about 2,800 in Year 2, and conservation-agriculture adoption rose to roughly 170% above the control group, adding an estimated 7% of cropped land under conservation agriculture across study villages. Published cost-effectiveness estimates for avoided sediment ranged from about US$7 per tonne under favourable assumptions to US$20 per tonne with ongoing payments, rising to as much as US$200 per tonne once monitoring costs are included.

Conclusions

The Government of Malawi and the World Bank drew directly on this evidence base to design the US$157 million Malawi Watershed Services Improvement Project (MWASIP, approved June 2020), which targets 95,000 ha of degraded land restoration in the middle and upper Shire and reports over 250,000 direct livelihood-support beneficiaries in its first three years. Public data on current per-farmer payment levels or disbursement under the scaled-up programme could not be found, so it is reported here as a documented pilot with a well-evidenced but not yet independently re-verified scale-up.

Mise en œuvre

Coût indicatif
Élevé (500 k€–5 M€) — Pilot payments: 1,200 Malawi Kwacha per 0.1 acre (standard subsidy) or 600 MKW per 0.1 acre plus 200 MKW per contiguous adopting neighbour (agglomeration bonus); scale-up MWASIP approved at US$157 million (World Bank, June 2020).
Délai jusqu’aux résultats
Long (> 3 ans) — Pilot ran 2014-2016; evidence used to design MWASIP, approved June 2020, running 2020-2026.
Personnel et compétences
Government of Malawi, IFPRI-ESPA Research Consortium, World Bank (MWASIP)

Conditions de réussite

  • Randomised controlled trial design enabling causal comparison against a control group
  • Payments delivered as agricultural input vouchers
  • Agglomeration bonus for contiguous adopting neighbours to capture catchment-scale benefits

Modes d’échec courants

  • Wide uncertainty in per-tonne avoided-sediment cost (US$7-200/tonne) depending on assumptions and whether monitoring costs are included
  • Public data on current per-farmer payment levels or disbursement under the scaled-up MWASIP programme could not be found

Kit de réplication

Artefacts réutilisables de cette pratique — tels que publiés par leurs sources.

Vous portez cette pratique ? Revendiquez-la — les porteurs vérifiés obtiennent un contact public sur la page et peuvent proposer des corrections.

Sources de données

D'où proviennent les informations de cette pratique, et quand.

Pièces jointes

Pratiques similaires qui pourraient vous être utiles