The 16/6 Project — Port-au-Prince's Post-Earthquake Neighbourhood Return Programme
Haiti
A joint UN–World Bank programme rebuilt housing across 16 Port-au-Prince neighbourhoods and closed 6 displacement camps after the 2010 earthquake, …
New Zealand · Christchurch · See the New Zealand profile · See the Christchurch profile
Top 64% 62/100 · Ask Evidence Copilot about this practice
After the 2010–11 earthquakes levelled much of central Christchurch, the community group Gap Filler turned vacant lots into temporary public spaces, part of a wave of over 700 transitional projects that academic studies link to stronger social and ecological connection.
The September 2010 and February 2011 Canterbury earthquakes destroyed much of central Christchurch, leaving hundreds of vacant lots as buildings were demolished faster than they could be rebuilt. Gap Filler, a community organisation founded after the first quake and expanded after the second, began temporarily activating these empty gravel sites with music, art, markets and public installations — low-cost, low-risk experiments that could double as placeholders until permanent redevelopment arrived.
Gap Filler worked alongside Life in Vacant Spaces (LiVS), which negotiated directly with landowners to match community projects to empty sites. Notable projects include the Dance-O-Mat, a coin-operated outdoor dance floor opened in 2012 that is still a regular fixture of the city, and the Pallet Pavilion at 'The Commons', a temporary venue built from shipping pallets that won a BEST Design Awards Silver in 2013 and was a finalist for the International Award for Public Art in 2014 before The Commons became a lasting space for markets and events.
Academic case studies (published in an IntechOpen collection on urban resilience and in peer-reviewed urban-studies journals) documented the wider transitional-urbanism movement Gap Filler helped anchor: The Conversation reports that over 700 transitional projects were implemented across Christchurch in the decade after the quakes, and researchers found the projects fostered more socially and ecologically connected communities and gave residents a low-stakes way to test new uses for the city before permanent investment.
A fair caveat: this evidence is largely qualitative case-study and journalistic documentation rather than a controlled impact evaluation, and Christchurch's formal, centrally-led rebuild plan running in parallel to these grassroots projects has itself been criticised (including in mainstream press) as slow and underdelivering — the transitional projects are best understood as a resilient community response operating alongside, not a substitute for, that troubled formal process.
Read the full analysis: https://www.intechopen.com/chapters/66155
Implementation detail (cost, timeline, staffing, conditions for success) is not yet available for this practice.
Do you run this practice? Claim it — verified implementers get a public contact pathway and can propose corrections.
Where this practice's information was retrieved from, and when.
Haiti
A joint UN–World Bank programme rebuilt housing across 16 Port-au-Prince neighbourhoods and closed 6 displacement camps after the 2010 earthquake, …
Jamaica
Since 2017, NGO Kingston Creative has used murals, festivals and a $1.3m IDB Lab programme (2021–24) to regenerate Downtown Kingston's …
Bolivia
Since 2000, La Paz's municipal government has upgraded more than 100 of the city's poorest hillside neighbourhoods through 'Barrios de …
Indonesia
Starting in Jakarta in 1969, Indonesia's Kampung Improvement Programme threaded paved paths, drainage, water and sanitation into existing 'kampung' neighbourhoods …
Open full copilot Grounded in cited practices — always check the sources.